SBI Clerk | SureSolv

SBI Clerk

Bank Clerk level Solved question Set 3, surface and volume measurement Mensuration 1

thumb_Bank-clerk-solved-question-set-3-mensuration-1-area-trapezium

This is the 3rd solved question set of 10 practice problem exercise for Bank Clerk level exams and the 1st on topic surface and volume measurement Mensuration. The set of 10 questions is followed by answers and then the detailed solutions explaining concepts used and how the problems could be solved quickly in mind with minimum writing...

How to solve difficult Time and Work problems in simpler steps, type 3

thumb_How-to-solve-difficult-time-work-problems-in-simpler-steps-type3

In a large number of math problems involving Time and Work, when more than one group of workers each comprising of a certain number of members, complete a job taking their own time, and the question is to find time taken by similar groups of workers but with different number of members, worker equivalence method invariably leads to much faster conceptual solution with greatly reduced calculation load...

Componendo dividendo applied on number system and ratio proportion problems

thumb_componendo-dividendo-in-number-system-ratio-and-proportion

Because of the easy systematic steps most likely we would be able to solve a problem quickly and wholly in mind by Componendo dividendo. In this session we have shown how problems not directly conforming to the Componendo dividendo can still be solved quickly using the concepts of Componendo dividendo...

How to solve Surds part 1, Rationalization

thumb_how-to-solve-surds-part-1-rationalization

Surds are a special group of irrational numbers that can be represented easily in compact form as $\sqrt{2}$, $\sqrt{3}$ etc. In addition, a number of quick math methods in simplifying surd problems make this topic a favored one for testing problem solving abilities in schools and competitive tests...

How to solve arithmetic boundary condition problems in a few simple steps

thumb_efficient-solution-of-boundary-condition-problems-aritmetic

A simple or compound event (consisting of more than one event) goes on happening systematically at regular intervals till a point just before the end. With each occurrence of the event problem parameters change. The end is reached before the full impact of the event along with the change can happen. This is the boundary to be found out before solving the problem...

How to solve Time and Work problems in simpler steps, type 2 brief

thumb_How-to-solve-time-work-problems-in-simpler-steps-type2-brief

In 42 days 40 men complete a work. As it happened, instead of all of them working together to finish the job, they started working together, but at the end of every 10th day 5 men left. In how many days would then the work be completed? Rich time and work concept of Mandays technique along with natural number concepts deliver speedy solution...

Pages

Subscribe to RSS - SBI Clerk